Turn-key construction of warehouses

SOLO Industrial Warehouse Complex

Total area:
12,000 sq. m.
Construction period:
May, 2005 - December, 2005
Location:
Shchelkovo, Russia
Customer:
SOLO Company
Construction budget:
25,000 rub./sq. m.
General Designer:
STROYFASA Constructions

Project description

Construction of a warehouse terminal for the storage of exclusive furniture, and production and restoration complex.

The construction site was characterized by a challenging terrain.

The building was erected on filled ground with driven piles of up to 18 m in length.

Pursuant thereto, the base stabilization technology was used for the floor slab, driveways, platforms, roads.

This project provides not only loading and unloading docks, but also a side dumping ramp for special over-sized cargo.