Construction of a warehouse terminal for the storage of exclusive furniture, and production and restoration complex.
The construction site was characterized by a challenging terrain.
The building was erected on filled ground with driven piles of up to 18 m in length.
Pursuant thereto, the base stabilization technology was used for the floor slab, driveways, platforms, roads.
This project provides not only loading and unloading docks, but also a side dumping ramp for special over-sized cargo.