One of the first A+ complexes in the territory of Ukraine.
The project is located in close proximity to the capital, which is ideal in terms of logistics operations.
The frame consists of monolithic reinforced concrete columns with a pitch of 24x12, which is the most economically sound based on the metal consumption of the building roof.