Reconstruction of projects

KNORR Factory

Total area:
5,000 sq. m.
Construction period:
December, 2011 - June, 2012
Location:
Tula, Russia
Customer:
Unilever
Construction budget:
0.5 billion rubles
General Designer:
BAUDORF

Project description

Works on reconstruction of the complex of enterprises for the production of food products were performed without interrupting the main production process.

Since this food production assumes high sanitary and technological requirements, a rare polymer coating (methyl methacrylate) was applied to bring the floor slab to required standards.

To organize production process, the state-of-the-art process and packaging equipment from English, Italian, German and Russian suppliers was installed at the factory.

The preparatory stage consisted of a range of works, including major repairs of the building and creation of new engineering infrastructure (power supply, lighting, ventilation and air conditioning, water treatment, sewerage, fire protection systems).

As a result, production capacity increased by 50% and reached 15 thousand tons of finished products (including dry mixes produced under KNORR trademark, including for public catering enterprises) per year.

Project location